Abstract

This paper shows the most usual causes on the failure cases in IT Project Management. There were evaluated different projects that finished without success. After the evaluation and the opinion of several researchers in the area, it got the main idea to get success, the capabilities of the project leader in management and leadership. Beside these ideas, there are other reasons why a project would be not completed successfully on time, cost or scope, here are detailed and a possible solution to avoid those problems. All the information collected is quantitative, because the percentage of projects that fails was calculated and why it happens. At the end of this contribution there are presented recommendations to improve the quality in the project management such as, schedule, control, tracking, and so on.

LanguageEnglish
Article number7273799
Pages2366-2371
Number of pages6
JournalIEEE Latin America Transactions
Volume13
Issue number7
DOIs
Publication statusPublished - Jul 1 2015

Fingerprint

Project management
Costs

Keywords

  • control metrics and indicators
  • data collection failure
  • internal politics
  • Management and methodology
  • Project IT management

ASJC Scopus subject areas

  • Computer Science(all)
  • Electrical and Electronic Engineering

Cite this

Analysis and improvement of the management of IT projects. / Piraquive, Flon Nancy Diaz; Crespo, Rubén González; García, Victor Hugo Medina.

In: IEEE Latin America Transactions, Vol. 13, No. 7, 7273799, 01.07.2015, p. 2366-2371.

Research output: Contribution to journalArticle

Piraquive, Flon Nancy Diaz ; Crespo, Rubén González ; García, Victor Hugo Medina. / Analysis and improvement of the management of IT projects. In: IEEE Latin America Transactions. 2015 ; Vol. 13, No. 7. pp. 2366-2371.
@article{e4084853ab564b02a80357af586e698c,
title = "Analysis and improvement of the management of IT projects",
abstract = "This paper shows the most usual causes on the failure cases in IT Project Management. There were evaluated different projects that finished without success. After the evaluation and the opinion of several researchers in the area, it got the main idea to get success, the capabilities of the project leader in management and leadership. Beside these ideas, there are other reasons why a project would be not completed successfully on time, cost or scope, here are detailed and a possible solution to avoid those problems. All the information collected is quantitative, because the percentage of projects that fails was calculated and why it happens. At the end of this contribution there are presented recommendations to improve the quality in the project management such as, schedule, control, tracking, and so on.",
keywords = "control metrics and indicators, data collection failure, internal politics, Management and methodology, Project IT management",
author = "Piraquive, {Flon Nancy Diaz} and Crespo, {Rub{\'e}n Gonz{\'a}lez} and Garc{\'i}a, {Victor Hugo Medina}",
year = "2015",
month = "7",
day = "1",
doi = "10.1109/TLA.2015.7273799",
language = "English",
volume = "13",
pages = "2366--2371",
journal = "IEEE Latin America Transactions",
issn = "1548-0992",
publisher = "IEEE Computer Society",
number = "7",

}

TY - JOUR

T1 - Analysis and improvement of the management of IT projects

AU - Piraquive, Flon Nancy Diaz

AU - Crespo, Rubén González

AU - García, Victor Hugo Medina

PY - 2015/7/1

Y1 - 2015/7/1

N2 - This paper shows the most usual causes on the failure cases in IT Project Management. There were evaluated different projects that finished without success. After the evaluation and the opinion of several researchers in the area, it got the main idea to get success, the capabilities of the project leader in management and leadership. Beside these ideas, there are other reasons why a project would be not completed successfully on time, cost or scope, here are detailed and a possible solution to avoid those problems. All the information collected is quantitative, because the percentage of projects that fails was calculated and why it happens. At the end of this contribution there are presented recommendations to improve the quality in the project management such as, schedule, control, tracking, and so on.

AB - This paper shows the most usual causes on the failure cases in IT Project Management. There were evaluated different projects that finished without success. After the evaluation and the opinion of several researchers in the area, it got the main idea to get success, the capabilities of the project leader in management and leadership. Beside these ideas, there are other reasons why a project would be not completed successfully on time, cost or scope, here are detailed and a possible solution to avoid those problems. All the information collected is quantitative, because the percentage of projects that fails was calculated and why it happens. At the end of this contribution there are presented recommendations to improve the quality in the project management such as, schedule, control, tracking, and so on.

KW - control metrics and indicators

KW - data collection failure

KW - internal politics

KW - Management and methodology

KW - Project IT management

UR - http://www.scopus.com/inward/record.url?scp=84942781139&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84942781139&partnerID=8YFLogxK

U2 - 10.1109/TLA.2015.7273799

DO - 10.1109/TLA.2015.7273799

M3 - Article

VL - 13

SP - 2366

EP - 2371

JO - IEEE Latin America Transactions

T2 - IEEE Latin America Transactions

JF - IEEE Latin America Transactions

SN - 1548-0992

IS - 7

M1 - 7273799

ER -